Careers

Hill International (Middle East) Ltd.
22

applicants

0

No. Views

 
Hill International (Middle East) Ltd.
To Apply Please follow the link:

http://ch.tbe.taleo.net/CH02/ats/careers/requisition.jsp?org=KJM&cws=2&rid=3823

Responsibilities:

Supervise PMC site Inspection team and make sure that each member of the team is aware of the project quality requirements.
Make sure that all inspection team members have access to an updated copy of the project documents related to the discipline of each member.
For small projects, Construction supervisor may be requested by COMPANY to perform the duty of the Inspection Engineer as per the relevant Job description.
Make sure that all site activities are properly monitored and all relevant quality records are established and maintained.
Regular visits to Project site to ensure quality of work is in compliance with contract requirements, good construction practice, only approved materials are used, compliance with shop drawings, and report any deviations to Construction Manager.
Make sure that all site inspections are carried out as per the intervention points marked in the approved Inspection and Test Plan.
Regular visits to CONTRACTOR’s stores to make sure that all storage, handling and preservation activities are carried as per the manufacturer recommendations.
Closely monitor the Project site activities in respect of Quality, Safety and Progress and advise Construction Manager of findings, area of concern and corrective action.
Participate with PMC staff in reviewing the Contract documents for each Construction package and advise COMPANY of any deficiency.
Review and comment on Contractors proposed site organization, key personnel CSV’s and advise Project Manager.
Review and monitor in timely manner, each Contractor proposed construction equipment and manpower histogram and advice COMPANY of any shortage.
Overview and comment on proposed Sub-Contractors, vendors, materials, shop drawings and any other transmittal by Contractor for each Construction Package.
Ensure Contractors Compliance with Contract obligations concerning Design changes. Trend Notices etc.
Assess change requests as submitted by Contractors and report to Construction Manager.
Review and initial PMC assessment of monthly progress invoices for each Construction Package.
Ensure PMC staff involvement in Quality, Safety and Progress aspects.
Involvement in Contractors Transmittals addressing Construction methodology. Method Statements, Project Quality Plan, Quality Control Procedures, Inspection and Test Plans, Safety Plan, Schedules and compliance with Project objectives.
Advise Construction Manager on any potential variation to scope of work, which may generate cost or time impact and present PMC assessment.
Participate with PMC staff in assessing variations, claims and report to COMPANY.
Advise Construction Manager of any foreseen slippage of Progress and propose corrective actions
Attend weekly progress meetings, weekly technical meetings and Monthly Executive Meetings. (Positively participate in agenda preparation), and prepare minutes of meetings.
Review weekly and monthly reports as presented by Contractors and present to Construction Manager Comments of non-compliance, and / or area of concern and corrective actions.
Participate with PMC in reviewing and implementing pre commissioning and commissioning plans.
Participate with PMC staff in final inspection of work and preparation of Punch List.
Participate with PMC staff in reviewing and assessing the Close Out Report submitted by Contractor.
Present feedback to COMPANY internal auditing and any other third party auditing hired by – COMPANY.
Overview the As-Built drawings, vendor and equipment warranties, O&M Manuals, Spare Parts and Training Programmes as submitted by Contractor.
Make sure that any non-conformity has been reported through a Non Conformance Report (NCR). AU NCRs shall be coordinated with the PMT Senior Quality Assurance Engineer.


Desired Candidate Profile The Fit-out & FF&E works CS should be an Architect with an extensive experience in finishing materials specifications, high class interior finishing works like stone cladding, wooden paneling, Tiling works, carpet works, Ceiling works, Different types of partitions, raised floor works, toilets finishes, sanitary wares and toilets accessories, solving issues related to site coordination between MEP and Architectural finishes, Construction management skills like planning, Progress monitoring against schedule and look heads, monitoring the progress of Engineering and Procurement, tracking material delivery, verifying manpower productivity, defining corrective and preventive actions for any non-conformity. Preferably from an ID company who has experience in Fit out works for offices and Hotels.

(Should be qualified Engineer / Architect BSc or higher) The senior discipline should have a minimum of 10 years’ experience in Engineering functions out of a minimum of 15 years overall experience. in Construction fields.
 
Additional Information
Location Abu Dhabi Job Type Full-time
Career Level Construction Relevant Work Experience



Contact Information
Company Name Hill International (Middle East) Ltd. Telephone No Not Provided
Contact Name HR Site Link Not Provided
 
Keywords: FF&E,  project management,  Fit-out,  construction,  construction management,  

               

Home | About Us | My Account | Browse by location | Browse by company | Browse by category | Faq | Feedback | Help
 
Copyright © Mega Recruitment Solutions Pvt Ltd. 2014